Astral Tiling delivered wet area, screeding, and tiling works for the SA Ambulance Service precinct.

Astral Tiling

The SA Ambulance Service precinct required durable, high-performance internal finishes across a range of operational and public-facing areas, where functionality, compliance, and aesthetics were equally critical. Astral Tiling’s scope on the SA Ambulance Service precinct formed part of the internal finishes package delivered within a fully operational healthcare infrastructure project in Adelaide.

“Our scope of work included all the tiling to the wet areas in the Emergency Operations Centre and ambulance station, as well as the main entrance, reception, and the EOC building,” explained Arif Haidari of Astral Tiling. “We also completed the screed and waterproofing in all wet areas.”

While architects selected the tiles and finishes, Astral’s role was to deliver installations that met the design intent while withstanding the demands of a 24/7 operational facility. This required close coordination with other trades on a live construction site.

“We had to stop and start each phase of our scope, especially in the reception area,” Arif said. “There was a lot of foot traffic, so we worked night shifts to complete screeding and tiling without disrupting progress.”

The sequencing constraints required ongoing coordination with the broader construction program, particularly around access and interface points. Despite this, the tiling package was delivered in line with program requirements and specification. “It was pretty smooth sailing overall,” said Arif.

Astral Tiling’s scope on the SAAS precinct reflects the broader role of specialist finishing contractors in delivering compliant, durable internal environments within complex healthcare infrastructure.

Within this context, tiling packages contribute not only to architectural finish outcomes but also to long-term operational performance in facilities subject to continuous use and strict hygiene requirements.

The project highlights the importance of installation quality, interface coordination, and program alignment in achieving functional outcomes across emergency services infrastructure.

For more information contact Astral Tiling, phone 0413 139 486, email info@astraltiling.com.au, website www.astraltiling.com.au



Tas Tiling Contractors delivered precision tiling solutions supporting architectural intent, durability, and performance at UTAS The Forest.

Tas Tiling Contractors

Tas Tiling Contractors completed a highly detailed tiling package that reflects the newly redeveloped University of Tasmania -The Forest project’s natural aesthetic and refined architectural vision.

The company was engaged to carry out tiling works across Level 2, including floors and walls of the Bridge area, along with approximately 300m² of flooring and 300m² of paving in the Level 1 car park. Works commenced in June 2024 and were completed in October 2025.

“The project involved working with detailed architectural layouts and various surface transitions, particularly around the Bridge and curved wall areas,” said Jiho Choi, Director, Tas Tiling Contractors. “Maintaining consistency in grout lines and tile alignment across complex geometries required close co-ordination with other trades and careful planning.”

One of the most technically demanding challenges was the installation of the thin brick tiles, which were cut down from full Brickworks Daniel Robertson bricks to just 20mm thick.

The project used an equal mix of three colour selections—Cambridge, Black and Buff—across the tiling surfaces. “Working with three different colours and slightly inconsistent brick sizes demanded precision and patience to ensure a uniform and high-quality finish,” Jiho explained.

Substrate preparation, levelling, and the selection of high-performance adhesives and grout systems were essential to achieving durability and performance in high-traffic areas. Tas Tiling Contractors undertook careful inspection and quality checks at each stage to ensure alignment with the design intent and long-term functional needs of the space.

“We’re proud of delivering high-quality finishes that align with the project’s natural aesthetic and architectural intent,” Jiho said. “It was a rewarding experience to contribute to such a significant Tasmanian project that combines design excellence with sustainability.”

“I’d like to thank our team for their hard work and Hansen Yuncken for their support throughout the project. We’re proud of what we achieved together,” said Jiho.

For more information contact Tas Tiling Contractors, U2 14A Main Road, Moonah TAS 7009, phone 0499 996 424, email
choi@tastiling.com

Dynamic Hobart Tiling ensured high-quality, durable, and coordinated tiling outcomes across
diverse spaces within The Forest redevelopment.

Dynamic Hobart Tiling

As one of Tasmania’s emerging leaders in specialist commercial tiling services, Dynamic Hobart Tiling, led by Director Henry Nguyen (Cert IV in Construction and Building), delivered proven technical expertise, exceptional attention to detail, and a highly collaborative approach to the landmark University of Tasmania – The Forest development.

At the University of Tasmania’s The Forest redevelopment, Dynamic Hobart Tiling mobilised its highly skilled team of ten tradespeople to execute complex wall and floor tiling works across multiple building levels. The scope included high-use, high-expectation environments such as Level 1 End-of-Trip facilities, Level 2 Back-of-House areas, teaching spaces, and premium corporate zones, all requiring a consistently high-end architectural finish.

“This project required the installation of a wide variety of tile formats, ranging from intricate Japanese mosaics to large-format panel tiles,” explains Henry Nguyen. “Achieving the specified finish demanded advanced technical capability, accurate setting-out, and strict adherence to workmanship standards across every stage of delivery.”

To mitigate long-term waterproofing, durability, and system compatibility risks, Dynamic Hobart Tiling implemented a fully integrated Mapei system, incorporating screeds, membranes, adhesives, grouts, and silicones. “By adopting a single, fully compatible system, we were able to secure full manufacturer warranties while ensuring long-term performance and consistency across all applications,” said Henry.

Project delivery was underpinned by disciplined coordination and early engagement with the builder, consultants, and key stakeholders. Dynamic Hobart Tiling worked closely with the builder, architect, and client from initial pricing and programming through to site mobilisation and final handover, ensuring all works were delivered in strict accordance with engineering and architectural documentation.

Documentation control, sequencing, and quality assurance were managed through Aconex and BIM 360, supported by regular site meetings that maintained clear communication across trades and significantly reduced the risk of downstream rework.

For Dynamic Hobart Tiling, The Forest project demonstrates how early technical input, consistent installation methodology, and collaborative site engagement can successfully deliver complex tiling packages within high-performance institutional and commercial environments.

Established in 2022 and led by Henry Nguyen, who brings more than a decade of hands-on industry experience supported by formal construction qualifications, Dynamic Hobart Tiling has rapidly built a reputation as a trusted contractor for high-end commercial and institutional projects across Tasmania.

For more information contact Dynamic Hobart Tiling, 230-234 Murray Street, Hobart TAS 7000 phone 0416 727 768, website www.dynamichobarttiling.com.au

Interface Tiling delivered high-performance tiling and waterproofing at 88 Leveson under tight access and sequencing constraints.

Interface Tiling

On tightly programmed residential towers, tiling and waterproofing sit at the intersection of multiple trades, compressed sequencing, and zero tolerance for failure.

At 88 Leveson, Interface Tiling was engaged to deliver technically robust, high-finish outcomes across bathrooms, kitchens, and rooftop terraces, under a programme and site environment that demanded precision, coordination, and disciplined execution.

Interface Tiling played a key role in delivering the refined, high-performance finishes across 88 Leveson, contributing complete bathroom and ensuite tiling, kitchen splashbacks, rooftop terrace tiling, and all waterproofing works throughout the project. Under the direction of David Pike, the team brought both technical expertise and detailed craftsmanship to site.

“88 Leveson had its fair share of logistical hurdles — tight access, limited parking, and restricted delivery windows kept everyone on their toes,” David said. “We also needed crane lifts to get materials up to the rooftop terraces. Our approach was always collaborative, working closely with site management to keep the programme flowing smoothly and ensure we weren’t impacting other trades.”

A critical component of the project’s long-term durability was Interface Tiling’s use of ATECH’s premium waterproofing systems. The rooftop areas were treated with ProtectoWrap sheet membranes, a solution selected for both performance and longevity. “The system gives exceptional durability and is backed by long warranties, which allowed us to deliver the kind of long-term performance the project needed,” David explained. “Our team genuinely enjoys using ATECH products. They’re consistent, user-friendly, and help us maintain a high standard of workmanship.”

Beyond systems and scheduling, the strength of the delivery lay firmly with the people on site. “Honestly, it comes down to the team,” David said. “Everyone took real pride in their part of the build. Our grout girls once again nailed the finishing details, they’re a huge reason our projects stand out.”

The finished result reflects Interface Tiling’s commitment to communication, collaboration and quality.

For more information contact Interface Tiling, E11 Hallmarc Business Park, 2A Westall Road, Springvale VIC 3171, phone 1300 468 371, website www.interfacetiling.com.au

Philton Group provided full tiling services for Floret Glen Waverley, covering bathrooms, kitchens, and laundries.

Philton Group

Philton Group brought their reputation for quality and consistency to the Floret Glen Waverley development, where they were engaged to deliver full tiling services across the multi-residential project.

Their scope covered bathrooms, ensuites, kitchens, and laundries—key wet areas that demand both durability and aesthetic cohesion.

“Given the size of the project, we staged the works and had a dedicated team on-site to maintain workflow and meet key deadlines,” said Tony Fakhoury, Managing Director of Philton Group.

While all tiles and finishes were selected by the client and design team, the Philton crew was responsible for executing those selections to the highest standard. “We worked strictly to the construction drawings and tile schedules to deliver everything to spec and on time,” Tony explained.

“Our focus was on clean, accurate installations with consistent quality throughout,” Tony said. That quality-first mindset helped ensure the finishes complemented the premium look and feel of the broader Floret Glen Waverley design vision.


Philton Group has expanded its business footprint with the recent acquisition of TILEPRO Australia and Melbourne Home Centre, adding the capacity for a tile and bathware showroom in Epping, as well as a warehouse to support wholesale supply to other tilers and builders. “This helps us offer better service, faster lead times, and a full end-to-end solution for our clients,” Tony said.

The move positions Philton Group to further enhance its service offerings while supporting the broader industry with premium products and logistical efficiency.

As both a trusted tiling contractor and a growing supplier, Philton Group is well placed to continue delivering precision and reliability across Victoria’s residential and commercial construction landscape.

For more information contact Philton Group, 35 Longford Road, Epping VIC 3076, for Trade shop TILEPRO Australia and Melbourne Home Centre, phone 0406 062 103