Case StudiesTiled Finishes in High-Use Public Infrastructure ProjectsAstral Tiling delivered wet area, screeding, and tiling works for the SA Ambulance Service precinct. 21/09/2026/by ANCR
Case StudiesShaping Interior Experience Through Plastering and Acoustic DetailIntegrated plastering and acoustic systems delivering compliant performance, refined finishes, and enhanced gallery experience. 21/09/2026/by ANCR
Case StudiesContinuous Curves, Seamless Design: Integrated Balustrade SolutionsAxiom Group delivered precision engineered, curved balustrades at St Clair, preserving design intent and ensuring compliance. 21/09/2026/by ANCR
Case StudiesA Flexible, Interoperable Approach to Modern Access ControlCOMMSecurity delivered an integrated, scalable security system at Brenan Place, enabling flexible, future-ready building operations. 21/09/2026/by ANCR
Case StudiesSupporting Building Services Validation Through Independent CommissioningBase Services Group delivered commissioning oversight at Brenan Place, validating building services performance through structured verification. 21/09/2026/by ANCR