O’Connors delivered full mechanical systems design and installation for the SA Ambulance Service precinct.
O’Connors
Delivering the full design and construct mechanical services package for the new SA Ambulance Service precinct, O’Connors played a central role in supporting one of the state’s most significant emergency infrastructure developments.
Drawing on 26 years of expertise across engineering, construction, and maintenance, the company reinforced its reputation as a leader in mechanical services through the delivery of this complex and high-performance project.
“Our scope included the complete design, coordination, and installation of HVAC systems, chilled and condenser water systems, ducted air distribution, ventilation, and the integration of the Building Management System (BMS),” explained Chintan Mody, Construction Manager. “We also ensured compliance with all fire, smoke, and essential safety measures, including stair pressurisation and smoke spill systems.”
Working alongside Hansen Yuncken and other key trades, O’Connors adopted BIM modelling and off-site prefabrication to overcome challenges such as congested plantrooms and tight access. “Prefabricating duct risers and pipe modules off-site saved time, reduced risks, and minimised site congestion,” Chintan said.


The main building, housing the Emergency Operations Centre, also demanded seismic resilience, rated at IL4, to ensure operational continuity during seismic events. “We designed and installed comprehensive seismic restraints for plant, ductwork, and pipework, requiring close collaboration with structural engineers and specialist suppliers,” Chintan noted.
Reliability was paramount for a 24/7 critical services facility. O’Connors selected a robust, high-efficiency plant designed for continuous operation, while ensuring maintenance access and monitoring through advanced BMS controls. “Our systems allow for rapid response capability, with full commissioning and performance testing against design parameters to guarantee operational reliability from Day One,” Chintan said.
Delivered ahead of schedule, the project highlights O’Connors’ ability to integrate technical excellence with collaborative project delivery. As Chintan concluded, “This project demonstrates our ability to meet ambitious milestones while ensuring safety, resilience, and long-term reliability.”
For more information contact O’Connors, 08 8410 4099, email admin@oconnorservices.com.au, www.oconnorservices.com.au