As part of the transformative Boyd Village development by PDG, Philip Chun’s role was to ensure the project adhered to regulatory requirements from concept to completion.

Appointed to deliver building surveying services in accordance with the Building Act 1993 and Building Regulations 2018, Philip Chun’s involvement spanned compliance assessments, building permit approvals, mandatory inspections, and final occupancy certification.

“Our engagement began in late 2019 with a compliance review of pre-tender design documentation,” said Andrew Urli, Director at Philip Chun. “From there, we provided detailed assessments across all design disciplines—structural, civil, architectural, and services—to ensure the design aligned with the Building Code of Australia 2019, which was applicable at the time.”

The site surrounding the heritage building for the former JH Boyd Girls’ School, presented a unique challenge for flood level compliance. “The minimum finished floor level needed to be significantly higher than surrounding streets and footpaths,” Andrew explained. “We worked closely with the design team to ensure Melbourne Water and Melbourne City Council authority requirements where satisfied.”

Philip Chun’s strategic involvement from the early design phase helped drive documentation quality and supported a streamlined approvals process. “Our early compliance reviews set a benchmark for the entire design team and consultants,” Andrew noted. “Once the builder came on board, we provided ongoing compliance reviews tailored to building permit staging, which enabled efficient delivery.”

Throughout the construction process, our statutory role requires mandatory inspections to be undertaken. Chris Farrell, who has over 30 years of experience as a building inspector conducted these inspections from foundations, to concrete pours, to fire rating of apartments on every storey through to completion. The attention to detail during the design and construction process emphasis’s the team aspect at Philip Chun, in being able to deliver a positive outcome for the project and the occupants of Boyd Tower.

From a building surveying perspective, Andrew highlighted the complex ground floor interface and the Level 6 terrace pool zone as particularly challenging and rewarding aspects of the project. “Navigating accessible provisions with elevated entries and rights of access around the adjoining parklands was intricate, but seeing it come together was incredibly satisfying.”

Through proactive engagement and expertise, Philip Chun helped deliver a compliant, accessible, and functional urban development in the heart of Southbank.

For more information contact Philip Chun, Suite 3, Level 1, 5 Queens Road, Melbourne VIC 3004, phone 03 9662 2200, website www.philipchun.com