Posts

Captain Formwork delivered complex structural formwork solutions across multiple towers at Newgreens Precinct with precision.

Captain Formwork

Delivering structural solutions for large-scale, high-density projects is one of the key challenges in modern construction— especially when tight timelines, safety standards, and design changes all converge on a live site.

Captain Formwork was responsible for the full structural formwork package for Parkview’s ambitious multi-building residential development.

“Captain Formwork was engaged to deliver formwork for all structural elements—basements, podium slabs, cores, columns, suspended slabs, and vertical structures,” explains Project Manager Andressa Bittar. “We were proud to be responsible for bringing to life the structural framework that supports this innovative project.”

The complexity of the site presented several challenges, with multiple buildings under construction simultaneously and design amendments occurring during the build. “It required careful sequencing and collaboration with other trades to maintain progress,” said Andressa. “We addressed these challenges through early planning, detailed methodology development, and real-time communication with Parkview’s site team.”

Captain Formwork’s strength lies in its ability to uphold safety, quality, and efficiency across all phases of a project. At Newgreens, the team implemented a staged delivery approach and allocated dedicated crews to each section of the site, supported by consistent supervision and centralised oversight. “We conducted regular toolbox talks, proactive risk assessments, and rigorous quality inspections to ensure we met the high standards expected on a project of this scale,” explained Andressa.

The Newgreens Precinct offered Captain Formwork the opportunity to demonstrate its expertise in managing large-scale, urban residential construction.

“From coordinating multiple work fronts to adapting to evolving designs, our team showed professionalism, flexibility, and technical precision throughout,” noted Andressa. “The project reflects our ability to deliver complex infrastructure efficiently while maintaining structural integrity and safety.”

For more information contact Captain Formwork, 5 Ferndell Street, South Granville NSW 2142, phone 02 9632 1739, email mail@captainformwork.com, website www.captainformwork.com.au

PDA powered Newgreens Precinct with expert high-voltage infrastructure and hands-on family leadership.

Power Distribution Australia

The Newgreens Precinct, a landmark golfside development in Sydney’s Chatswood, demanded more than just visionary architecture and luxury finishes—it required robust and future-ready electrical infrastructure. Stepping up to meet this challenge was Power Distribution Australia (PDA), a family-owned business renowned for delivering high-voltage electrical solutions across New South Wales.

Led by Emily and Tony Rossi, the father-daughter team behind PDA brought over 60 years of combined industry experience to the site.

“We were responsible for the installation of a 1000KVA Ausgrid kiosk substation to support the precinct’s energy needs,” said Director Emily Rossi. “That included more than 400m of excavation, conduit and cable installation to extend the Ausgrid high-voltage network—no small feat in a built-up, environmentally sensitive area.”

PDA’s work involved navigating complex site logistics, including tree protection zones, existing infrastructure, and close residential proximity. “We prioritised clear communication with nearby residents and took every measure to comply with electrical authority and council requirements,” Emily noted. “Working within those constraints while maintaining safety and efficiency is where our experience really shines.”

One of the standout technical challenges was the installation of the site’s earthing grid, which required specialised equipment due to the area’s unique soil and construction characteristics.

With over a decade in operation, PDA has built a reputation for precision, safety, and family-driven values. “Having directors who are hands-on and deeply invested in each project makes a real difference,” Emily added. “We’re proud to have contributed to the backbone of a development that blends innovation with community living.”

The Newgreens Precinct now stands powered and future-ready—thanks in no small part to the expert hands at PDA.

For more information contact Power Distribution Australia (PDA), 57 Argyle Street, South Windsor NSW 2756, phone 02 8880 3514, email tony@pdas.com.au, website www.pdas.com.au

Sandstone Wall Solutions enhanced Newgreens with expert sandstone cladding, retaining walls, and a feature clubhouse wall.

Sandstone Wall Solutions

At the prestigious Newgreens Precinct in Chatswood, Sandstone Wall Solutions played a standout role in adding warmth, texture, and timeless appeal to the development through their expertise in sandstone cladding and retaining walls.

With seven years in the industry and a team of 26 experienced tradespeople, the company brought their signature attention to detail and innovative thinking to this large-scale project.

“Our team of 12 worked across several key features at Newgreens,” said Managing Director Charbel (Charlie) Sarkis. “This included sandstone cladding to the clubhouse and units, constructing block retaining walls along the pedestrian walkway, and a feature wall inside the clubhouse. Each element needed to blend seamlessly with the natural and architectural design of the precinct.”

“The feature wall within the clubhouse was one of the most technically demanding aspects,” Charlie explained. “It required meticulous planning and creative problem-solving to ensure it met both aesthetic and structural expectations.” Access was another hurdle—especially for the block retaining walls, where tight site conditions demanded expert coordination and ingenuity.

Sandstone Wall Solutions’ ability to work under pressure and maintain their hallmark craftsmanship made a lasting impression. Their natural sandstone installations not only enhance the visual appeal of the development but also contribute to the longevity and resilience of the landscape.

The team’s commitment to quality continues to shine across a portfolio of high-profile projects, including concrete sleeper walls at Forest Reach, sandstone block walls in Warriewood, and the Mosman Lookout on Chowder Bay Road.

“Each job has its own story, but our approach remains the same—deliver beautiful, durable work that complements the environment,” Charlie said. “We’re proud to have contributed to a landmark project like Newgreens and look forward to more creative challenges ahead.”

For more information contact Sandstone Wall Solutions, 8-10 Harris Road, Dural NSW 2158, phone 0414 769 016, email solutions@sandstonewalls.com.au, website www.sandstonewalls.com.au

Traffix delivered smart, tailored transport solutions to overcome access, waste, and mobility challenges at Newgreens.

Traffix

Since late 2019, Traffix Pty Ltd has played a pivotal role in shaping the functionality and accessibility of the Newgreens Precinct. As a mixed-use site with a diverse set of transport needs, including residential, hospitality, and golf club component, the project demanded tailored, high-performing traffic and transport solutions.

“Our scope was comprehensive,” says Ben Liddell, Director at Traffix. “From the initial Traffic Impact Assessment to
post-approval construction planning, we worked closely with Parkview and Willoughby City Council every step of the way.”

The team addressed key challenges early—particularly the steep grade difference between Beaconsfield Road and the precinct’s Level 3 top level. “We had to provide safe, compliant access for everything from passenger vehicles to fire trucks and ambulances. It required extensive modelling and precision design to meet the Australian Standards for both grade and width,” Ben explains.

One unique obstacle was accommodating waste collection within the basement. “Typical garbage trucks just wouldn’t fit. Our solution involved mini waste trucks and redesigning the basement ramping to suit them,” says Ben.


Traffix also integrated sustainability into their strategy, recommending 48 bicycle parking spaces, dedicated bike lanes, and safe pedestrian links to bus stops and surrounding infrastructure. A private minibus service was also planned to assist resident mobility.

Collaboration was key to success. “We had over five years of ongoing coordination with architects, engineers, and the builder. From design reviews to swept path analyses, we ensured our traffic planning matched the project’s overall vision,” notes Ben.

Even during the challenges of 2020’s remote working conditions, Traffix remained committed. “Online meetings were new to us all, but we adapted quickly to keep progress moving.”

For more information contact Traffix Pty Ltd, Suite 2.08, 50 Holt Street, Surry Hills, NSW 2010, phone 02 8324 8700, email info@traffix.com.au, website www.traffix.com.au

Chalouhi’s civil works prioritise safety, sustainability, and efficiency, ensuring successful early and civil works at Newgreens.

Chalouhi

Chalouhi was engaged to complete extensive early and civil works that enabled the successful transformation of the former Chatswood Golf Course into the $250 million Watermark luxury retirement living community.

Their scope included demolition, soil remediation, bulk and detailed excavation, rock face stabilisation, installation of permanent ground anchors and construction of temporary haul roads. They have managed in delivering the project on time with high quality while prioritising safety, sustainability, and efficiency. “We leveraged our in-house plant and machinery to manage critical aspects like demolition, excavation, and traffic planning, ensuring control and flexibility across the 51-week project,” said Christine.

The site’s previous use as a golf course presented major environmental and logistical challenges. Chalouhi managed the Green Star-rated demolition of a 3-storey clubhouse and remediated over 15,000m² of contaminated material across the site, including asbestos-affected soil Sustainable practices were also prioritised throughout the project, with over 70,000m³ of sandstone being crushed, recycled and reused onsite. In particular, 25,000m³ has been used to construct a 2,500m² temporary access road, minimising material waste and noise disruption.

Traffic management was another key component. Oversized equipment, including 40-tonne dump trucks and 110-tonne surface miners, had to be carefully transported via narrow local roads. Chalouhi worked closely with local councils to secure permits and reduce community impact.

In addition to environmental remediation and complex logistics, Chalouhi undertook detailed planning to ensure their works integrated seamlessly with other construction activities. Their expertise in sequencing multiple operations (ground anchoring, stabilisation, and utility preparation), was essential in maintaining project momentum.

Chalouhi’s strong stakeholder communication, proactive problem-solving, and real-time project tracking helped keep the project on track. Their coordination of complex, multi-disciplinary work streams showcases their expertise in high-density, multi-stage urban developments. A commitment to sustainability, quality, and collaboration has made them a trusted partner in shaping Sydney’s future communities.

For more information contact Chalouhi, 1 Cosgrove Road, South Strathfield NSW 2136, phone 02 9790 3799, email
admin@chalouhi.com.au, website www.chalouhi.com.au