Civil Contracting Solutions QLD delivered early works at Barracks Road, overcoming terrain challenges with precision.

Civil Contracting Solutions QLD

Civil Contracting Solutions QLD, a South East Queensland based civil contractor operating since 2018, has successfully delivered the full package of civil works for the Lot 2 Barracks Road project within the Metroplex Westgate precinct.

Known for their expertise in end-to-end civil construction—from early engagement through to practical completion—Civil Contracting Solutions brought their extensive experience and collaborative approach to this landmark industrial development.

“Civil Contracting Solutions was engaged for the full civil works package, including bulk earthworks, stormwater, pavements, and the design and construct of both boulder and concrete sleeper retaining walls,” said Senior Project Engineer, Jen Third. This broad remit demanded technical agility and close coordination with the client and other contractors.

One of the site’s major challenges was the significant change in ground level between the development site and the surrounding streets. “This provided unique challenges, but we were able to deliver a combination of fully certified design and construct retaining walls that were both cost-effective and efficient,” said Jen.

Additionally, unexpected rock conditions during excavation required swift adaptation of methodology and resource allocation to maintain the programme.

Civil Contracting Solutions QLD delivered early works at Barracks Road, overcoming terrain challenges with precision.

Civil Contracting Solutions ensured that safety and quality remained a top priority throughout. “We operate under an ISO-certified Quality Management System, and our in-house engineering and management team maintained close oversight throughout the build,” said Jen. “This allows us to identify and rectify any issues early while delivering to Tier 1 standards.”

A key highlight of the project was the early completion of Civil Contracting Solutions’ scope, allowing Douglas Construction to take possession of the building pad ahead of schedule. “The success of this project really came down to collaboration, technical expertise, and a team that’s dedicated to delivering above expectations,” Jen concluded.

For more information contact Civil Contracting Solutions QLD, phone 0407 714 724, email ben@ccsqld.com

DuraCube delivered a precise, compliant, and on-time washroom fit-out for Lot 2 Metroplex Westgate development.

DuraCube

As part of the new Metroplex Westgate development in Brisbane, DuraCube delivered a high-quality washroom fit-out for the facility. Known for their reliable commercial cubicle systems and washroom accessories, DuraCube supplied and installed a comprehensive package designed for durability, compliance, and seamless site integration.

“Our scope at Lot 2 Barracks Road Metroplex included 18 pedestal-mounted overhead braced partitioning systems, five floor-mounted systems with shower seats, six wall-mounted privacy panels, eight grab rails, and 18 toilet roll holders,” said Nick Serafin, DuraCube’s Marketing Manager.

From the earliest design phases, DuraCube worked closely with project stakeholders to ensure a smooth process. “We were engaged while the project was still on paper, providing design and compliance support, followed by a detailed proposal documenting every element—from layouts and materials to colours and features,” Nick explained.

Once construction was ready for fit-out, DuraCube conducted final site measurements to ensure a perfect fit. The company’s in-house designers then produced shop drawings based on those dimensions. All components were manufactured in Sydney, where they were pre-drilled, cut, quality-checked, and packed for delivery and installation.

While the job was technically standard, it required strong scheduling coordination. “We accommodated the builder’s installation date preferences, working around multiple trades and a tight project handover window,” Nick noted. The result was a clean, functional, and compliant washroom installation that met the project’s strict timelines.

DuraCube is a trusted Australian manufacturer and installer of premium commercial toilet partitions and washroom systems, delivering durable, functional, and compliant solutions for education, healthcare, retail, and commercial sectors. Based in Sydney, DuraCube offers end-to-end service—from design consultation and custom fabrication to onsite installation—ensuring every project meets exact specifications. With a focus on quality, precision, and customer satisfaction, DuraCube is known for delivering on time, every time.

For more information contact DuraCube, 13 Pullman Place, Emu Plains NSW 2750, phone 1300 387 228, email sales@duracube.com.au, website www.duracube.com.au

Red Sand Ecology ensured environmental compliance and sustainability at Metroplex Westgate through expert planning and oversight.

Red Sand Ecology

At Wacol’s Metroplex Westgate precinct, Red Sand Ecology, led by Managing Director Sarah Hobson, ensured the project met top environmental standards. Their scope encompassed implementing erosion and sediment control plans for the entire Metroplex Westgate site in accordance with Brisbane City Council guidelines, requiring coordination with Douglas Constructions & Engineering (Lot 2) and Hutchinson Builders.

“We collaborated closely with the contractors to make sure our erosion and sediment control measures weren’t just compliant on paper but were actively upheld on site,” said Sarah. “Our inspections and oversight helped ensure that the work being done supported both council regulations and the project’s environmental objectives.”

Red Sand Ecology also contributed to fulfilling Green Star requirements drafting a technical memorandum to support the project’s environmental reporting. This included outlining how historical and legislative requirements were being addressed throughout the development.

“We participated in pre-start meetings with Brisbane City Council, helped shape erosion management plans, and mediated environmental risks with the regulators,” Sarah explained. “We also undertook water quality monitoring during construction and supported Hutchison Builders in ensuring ongoing environmental compliance.”

Known for their work across major council infrastructure and commercial projects, including involvement in Brisbane Metro’s sustainable transport initiative, Red Sand Ecology brings specialist experience in planning, due diligence, on-ground ecological surveys, plan development, and long-term monitoring.

“Our focus is on ensuring environmental integrity from the earliest planning stages through to practical completion,” said Sarah. “It’s about finding practical, science-led solutions that work for developers, councils, and the environment.”

At Metroplex Westgate, their expertise helped deliver a more sustainable, compliant, and environmentally responsible outcome, reinforcing Red Sand Ecology’s reputation as a trusted partner in Queensland’s growing infrastructure landscape.

For more information contact Red Sand Ecology, 1300 733 763, admin@redsandecology.com.au, website redsandecology.com.au

T&M Cabinets delivered durable, high-quality cabinetry and stonework for a modern, high-traffic commercial facility.

T&M Cabinets

T&M Cabinets brought their signature craftsmanship to the Lot 2 Barracks Road development at Metroplex Westgate, delivering a complete cabinetry and stonework package for the modern commercial-industrial facility.

Commissioned by long-time collaborators Douglas Construction, the project included the manufacture and installation of kitchen and bathroom cabinetry and stonework tailored to suit a high-traffic workplace environment. “The space needed to be highly functional, serving a large array of office and factory staff, and the materials reflected that,” said Managing Director Nick Theodotou.

Working to architectural plans and finish selections provided by the Douglas Construction team and project architects, T&M Cabinets delivered a seamless integration of durable Laminex finishes and Caesarstone benchtops, chosen for both their practicality and visual appeal. While T&M Cabinets is best known for its high-end residential joinery, the Metroplex project demonstrated their capacity to pivot smoothly into commercial territory.

“Although our main focus is high-end residential cabinetry, we enjoy working in the commercial space. We’re well equipped to handle commercial projects, the core principles are the same. It’s just the materials and finish that differ.” Staying on schedule was a key priority in a fast-paced build.

“Timelines can quickly move on large scale commercial projects , but we have a great working relationship with our clients and ensure timelines are met,” Nick added. “We’ve worked with Douglas Construction for years—we know how to work well within their systems.”

T&M Cabinets has also delivered custom joinery on other Douglas projects, including the intricate reception and feature wall installations at 114 Gilmore Road, Berrinba—a testament to their design versatility and attention to detail. From luxury homes to large-scale developments, T&M Cabinets continues to combine precision, functionality,
and finish with every project.

For more information contact T&M Cabinets, Shed 1, 8 Proprietary Street, Tingalpa QLD 4173, phone 07 3890 0845, email info@tandmcabinets.com.au, website www.tandmcabinets.com.au

JKA delivered custom glazing solutions balancing acoustic, energy, and aesthetic requirements for Metroplex Westgate.

JKA Commercial Glazing

JKA Commercial Glazing was engaged to deliver specialist glazing solutions that met Lot 2 Barracks Road’s rigorous design and performance standards. JKA’s scope included the supply and installation of commercial-grade aluminium windows and doors for both internal and external applications.

Externally, the team installed 150mm x 50mm front-glazed commercial framing, hinged doors, and an automatic sliding door, incorporating energy-efficient and acoustically rated Insulated Glass Units (IGUs). Internally, the same framing system was used along with double-pocket acoustic glazing, ensuring privacy, noise control,
and compliance across the board.

“Key requirements for the project included wind and water ratings, acoustic and energy performance, powder-coating, hardware, and aesthetic consistency,” said Andrew Woods, JKA General Manager. “We worked closely with Douglas Construction and used our in-house review systems to analyse all specifications, ensuring compliance with Australian standards and design intent.”

One of the standout challenges was finding glazing solutions that could balance energy efficiency, soundproofing, and privacy. JKA sourced and combined different types of glass, including painted glass for spandrel panels and coloured films for blocked-out privacy sections—often within the same window. Products used included Alspec Hunter front-glazed and acoustic framing, Alspec Swan commercial doors, and Duratec Zeus powder-coated finishes, paired with advanced IGU configurations and Auto Ingress operators.

Some windows, measuring up to 4.2m high, required pre-glazing offsite and installation using cranes and vacuum lifters due to limited site access. Despite these complexities, JKA delivered a sleek, high-performing glazing package.

“Our involvement in Metroplex Westgate highlights our ability to extract precise requirements from complex documents and deliver high-calibre glazing solutions on time,” said Andrew. “It’s a true testament to the expertise of our fabrication and installation teams, and our collaborative approach with clients and contractors.”

For more information contact JKA Commercial Glazing, 22 Griffin Crescent, Brendale QLD 4500, phone 07 3881 3442, email sales@jkaglazing.com, website www.jkaglazing.com.au