Lot 2 Metroplex Westgate - Douglas Construction & Engineering

Future-Focused, Function-Driven

Douglas Construction & Engineering (DCE) has successfully delivered Lot 2 Barracks Road, within the strategically located Metroplex Westgate. Designed and constructed to meet the evolving needs of modern logistics and industrial operations, the project features a high-specification warehouse, integrated office spaces, and external works.

Douglas Construction & Engineering (DCE) has successfully completed the state-of-the-art industrial facility at Lot 2 Barracks Road within the Metroplex Westgate precinct in Wacol, Queensland.

Purpose-built for flexibility, this premium-grade facility features two fully independent tenancies with dedicated office and warehouse zones

  • High-clearance warehousing and expansive hardstand areas
  • Targeting a 5 Star Green Star Buildings v1.0
  • >35% reduction in Upfront embodied carbon emissions
  • Large Suspended Warehouse slab over an undercroft car park

“This project showcases our commitment to building smarter, more sustainable industrial spaces that meet the evolving needs of both tenants and investors,” said Mark Falconer, Pre-Construction and Sustainability Manager.

The Metroplex Westgate development is a premier industrial estate strategically located at the interchange between the Centenary Highway and Ipswich Motorway, providing seamless access to Brisbane’s major arterial roads. This prime location is ideal for logistics and distribution operations, enhancing the appeal of the facilities within the estate.

DCE’s scope of work for Lot 2 Barracks Road encompassed the design and construction of the high-specification industrial warehouse, complete with associated office spaces and external works. The facility was meticulously planned to meet the stringent requirements of contemporary industrial operations, focusing on functionality, durability, and adaptability.

“Our objective was to deliver a facility that not only meets the immediate operational needs of our client but also offers flexibility for future growth,” said Alex Douglas, Director, Construction at DCE. “We collaborated closely with all stakeholders to ensure that the design and construction processes were aligned with the client’s vision and the overarching goals of the Metroplex Westgate development.”

The construction process involved the use of advanced building techniques and high-quality materials to ensure the longevity and resilience of the facility.

DCE’s experienced project management team coordinated various aspects of the build, from site preparation and structural works to the installation of services and final fit-out, ensuring that the project was completed on time and within budget.

Sustainability was a key consideration throughout the project. DCE implemented environmentally responsible construction practices, including efficient waste management, energy-efficient lighting systems, and the use of sustainable building materials.

These initiatives align with the broader sustainability objectives of the Metroplex Westgate precinct, which aims to set new benchmarks in economic, environmental, and social sustainability.

“Delivering this project at Lot 2 Barracks Road reinforces our position as a leading provider of industrial construction solutions,” Manish Jaiswal (General Manager Construction) added. “We take pride in our ability to deliver projects that not only meet but exceed our clients’ expectations, contributing to the growth and success of their operations.”

The successful completion of the Lot 2 Barracks Road facility adds to DCE’s impressive portfolio of industrial projects and highlights the company’s expertise in delivering complex construction projects within dynamic and fast-paced environments.

For more information contact Douglas Construction & Engineering, Suite 4, 1 Swann Road, Taringa QLD 4068, phone 07 3839 0176

Lot 2 Metroplex Westgate

Fact Box

Main Construction Company: Douglas Construction & Engineering

Architect: Watson Young Architects

Structural Engineer: Tungsten Structures

Project Value: $30 million

Scroll to Read More