2,000 Tonnes of Safety: Scaffold to Ensure Safe, Efficient Trade Access
Stilcon Industrial Services delivered safe, engineered façade access and scaffolding, ensuring efficiency, safety, and capability building.
Stilcon Industrial Services
From day one at the LIV Albert project, safety and accessibility for all trades were paramount. Stilcon Industrial Services (SIS) was engaged to deliver full perimeter protection and engineered façade access systems, ensuring work progressed efficiently and securely.
“Our role was to design and implement systems that allowed trades to carry out their tasks without compromise,” said SIS Director, Kristina Nobel. “By providing reliable fall protection and scaffold access across all levels, we gave the project team the confidence to build efficiently while maintaining the highest safety standards.”



SIS utilised Kwikstage scaffolding with integrated aluminium stair towers, a system selected for its strength, flexibility, and reliability. “We co-ordinated closely with the formwork contractor and Mirvac to deliver a safe, efficient erection programme. Because no subsequent works could commence until perimeter fall protection was in place on each level, our sequencing and collaboration were critical to keeping the build on schedule,” said Gary Carlise, Operations Supervisor,.
The project wasn’t without its technical challenges. LIV Albert’s façade included complex balcony geometries that required tailored access solutions. “Our scaffolders and in-house design team worked in lockstep to engineer practical, safe configurations that maintained clear work zones for all trades despite the challenging details,” Gary said.
In total, more than 2,000 tonnes of steel scaffolding were erected and dismantled safely, ahead of programme, and without incident. “We’re proud of the seamless effort from our field crews and design engineers to deliver at scale and ahead of programme. It reflects our commitment to safety, precision, and dependable delivery,” explained Gary.
“Special mention to Lachie Devlin, our recent graduate, who helped deliver his first project, and to Gary Carlisle, our Operations Supervisor, who mentored him throughout. It’s a great example of our capability building in action,” said Kristina.
For more information contact Stilcon Industrial Services, 134-140 Fairbairn Road, Sunshine West VIC 3020, phone 1300 287 747, website www.stilconindustrialservices.com.au