O’Connors delivered full mechanical systems design and installation for the SA Ambulance Service precinct.

O’Connors

Delivering the full design and construct mechanical services package for the new SA Ambulance Service precinct, O’Connors played a central role in supporting one of the state’s most significant emergency infrastructure developments.

Drawing on 26 years of expertise across engineering, construction, and maintenance, the company reinforced its reputation as a leader in mechanical services through the delivery of this complex and high-performance project.

“Our scope included the complete design, coordination, and installation of HVAC systems, chilled and condenser water systems, ducted air distribution, ventilation, and the integration of the Building Management System (BMS),” explained Chintan Mody, Construction Manager. “We also ensured compliance with all fire, smoke, and essential safety measures, including stair pressurisation and smoke spill systems.”

Working alongside Hansen Yuncken and other key trades, O’Connors adopted BIM modelling and off-site prefabrication to overcome challenges such as congested plantrooms and tight access. “Prefabricating duct risers and pipe modules off-site saved time, reduced risks, and minimised site congestion,” Chintan said.

The main building, housing the Emergency Operations Centre, also demanded seismic resilience, rated at IL4, to ensure operational continuity during seismic events. “We designed and installed comprehensive seismic restraints for plant, ductwork, and pipework, requiring close collaboration with structural engineers and specialist suppliers,” Chintan noted.

Reliability was paramount for a 24/7 critical services facility. O’Connors selected a robust, high-efficiency plant designed for continuous operation, while ensuring maintenance access and monitoring through advanced BMS controls. “Our systems allow for rapid response capability, with full commissioning and performance testing against design parameters to guarantee operational reliability from Day One,” Chintan said.

Delivered ahead of schedule, the project highlights O’Connors’ ability to integrate technical excellence with collaborative project delivery. As Chintan concluded, “This project demonstrates our ability to meet ambitious milestones while ensuring safety, resilience, and long-term reliability.”

For more information contact O’Connors, 08 8410 4099, email admin@oconnorservices.com.au, www.oconnorservices.com.au



Mycon Air delivered Design & Construct mechanical services at Addison Street, integrating HVAC, ventilation, and plant systems.

Mycon Air

Delivering mechanical services within architecturally driven residential developments demands meticulous coordination, technical expertise, and seamless integration across multiple building systems.

At the Addison Street project in Marrickville, Mycon Air successfully delivered a comprehensive Design and Construct (D&C) mechanical package for 21 apartments and associated common areas.

Mycon Air’s scope incorporated the complete mechanical services solution. By managing the entire mechanical package, the company ensured consistency across all systems while streamlining project delivery and coordination.

“We undertook the entire mechanical scope of works,” said Mycon Air Director, Miro. “This included basement ventilation, all apartment HVAC systems, and wet area ventilation, allowing us to provide a fully integrated solution throughout the development.”

One of the project’s most significant challenges arose at rooftop level, where limited plant space required the accommodation of 21 condensers alongside solar infrastructure, skylights, hydraulic services, and associated ductwork within a highly constrained area. Achieving this arrangement demanded detailed spatial planning to maintain code-compliant clearances, accessibility for maintenance, and efficient service integration without compromising architectural intent.

Overcoming these constraints required extensive collaboration with other trades, including hydraulic and solar contractors, as well as strategic redesign of the ductwork layout to maximise the available space. Through careful coordination and proactive problem-solving, Mycon Air delivered a compliant, accessible, and highly efficient rooftop plant arrangement that met both performance requirements and the project’s architectural objectives.

“Experience certainly plays a major role, but communication and coordination with the other trades are the key to successfully delivering projects of this nature,” Miro said.

With a reputation built on delivering complex, high-end residential developments across Sydney, Melbourne, and Brisbane, Mycon Air continues to demonstrate its ability to overcome technical challenges while maintaining exceptional quality standards.

The Addison Street project further reinforces the company’s commitment to delivering innovative and efficient mechanical solutions that integrate seamlessly within carefully considered built environments.

For more information contact Mycon Air, phone 02 9191 7393, email sales@myconair.com.au, website www.myconair.com.au



McCluskey Heating & Cooling delivered HVAC and humidification systems ensuring precise gallery climate control and preservation.

McCluskey Heating & Cooling

Delivering a stable and controlled internal environment is critical in any gallery setting, where fluctuations in temperature and humidity can directly impact the preservation of artworks.

At the Art Gallery of Swan Hill redevelopment, McCluskey Heating & Cooling was engaged to deliver a mechanical services solution capable of meeting these requirements.

With over 13 years in operation and a dedicated team of 12, McCluskey Heating & Cooling specialises in commercial and residential heating, cooling and mechanical ventilation systems, including ducted air conditioning, VRF systems and energy-efficient climate control solutions. “Our team delivered the full mechanical scope, ensuring the gallery spaces achieved the level of environmental control required for artwork preservation,” said Director Luke McCluskey.

A key challenge of the project was meeting the strict environmental requirements necessary for a gallery environment. Beyond temperature control, maintaining consistent humidity levels was essential to protect sensitive artworks from deterioration. “We incorporated humidification systems and worked closely with the design team to ensure stable environmental conditions were maintained,” Luke explained.

Achieving this level of precision required close coordination with project stakeholders and a detailed commissioning process to fine-tune system performance. “This wasn’t just about installing systems—it was about ensuring everything worked together seamlessly to achieve the required performance,” Luke said.

The result is a carefully controlled internal environment that supports the gallery’s expanded exhibition capabilities while safeguarding its collection.

McCluskey Heating & Cooling’s contribution highlights the critical role of mechanical services in cultural infrastructure, where performance, reliability and precision are essential.

For more information contact McCluskey Heating & Cooling, 8 Mcharry Place, Shepparton VIC 3630, phone 0434 447 454, email office@mccluskeyheatingandcooling.com.au, website www.mccluskeyheatingandcooling.com.au



Richmond Co delivered coordinated civil, earthworks, piling, and stormwater infrastructure for Adelaide’s ambulance emergency operations centre.

Richmond Co.

Richmond Co has built a reputation for delivering complex civil construction projects with precision, adaptability, and a strong focus on sustainability. Their contribution to the new SA Ambulance Service precinct in Adelaide showcases the company’s ability to combine technical expertise with collaborative site management on critical infrastructure projects.

The precinct, developed by Hansen Yuncken, represents a major investment in the state’s emergency services infrastructure. For Richmond Co, the project brought together multiple stages of civil delivery, showcasing the breadth of the company’s capability across complex infrastructure works. “Our scope included undertaking the demolition, bulk earthworks, piling pad construction, and later we were awarded the stormwater component” explained Emmanuel Mouhalos, General Manager.

Richmond Co’s role began with early site preparation. Their demolition and earthworks teams cleared the way for new structures while constructing piling pads to support the ambitious design. Later in the program, they returned to deliver the stormwater package. “It took four days to crane the stormwater drains into place, with a lot of preparation required to enable sole access for us on site,” Emmanuel said. Careful planning and daily meetings ensured works were delivered safely and efficiently.

Working on a city-fringe site often comes with logistical challenges, but Richmond Co adapted with planning and communication. “The site was quite big and we were the first ones in, so we had the site to ourselves,” Emmanuel explained. “When we came back for the stormwater component, we had to manage other trades on site and exclusion zones based on daily meetings with Hansen Yuncken. A lot of planning and programming went into mitigating any issues with deliveries and trucks.”

Richmond Co. onsite.

Environmental responsibility remains central to Richmond Co’s operations. “We were able to substitute some material on site, such as recycled PM2 rubble as the base,” Emmanuel said. The team also implemented filtration systems at the tops of pits to ensure runoff was managed responsibly and no stormwater was contaminated.”

Unexpected challenges arose during stormwater excavation. “We did find some services in the stormwater excavation,” Emmanuel recalled. “We diverted them around our work area, this enabled us to stay on program” The team’s ability to adapt quickly and reroute services without disruption highlighted their problem-solving skills and site experience.

Richmond Co worked hand-in-hand with Hansen Yuncken and other contractors to align civil works with the broader construction program.

“We had daily meetings at 1pm to discuss the next day’s activities to ensure contractors and works lined up,” Emmanuel explained. “There was also quite an in-depth preparation in the lead up to the project in terms of methodologies and timelines.”

This consistent communication created a streamlined process that reduced delays, avoided clashes, and reinforced a culture of safety and accountability across the site.

For Richmond Co, the project was more than just another civil works package, it was an opportunity to contribute to a critical piece of public infrastructure while highlighting the teams strengths:

As Adelaide continues to grow, Richmond Co’s role in shaping the built environment underscores its reputation as a trusted partner in civil construction, capable of delivering results that are both technically precise and community-focused.

For more information contact Richmond Co, 2 Inglis Circuit, Gillman SA 5013, phone 08 8359 1946, website www.richmondco.au




RB&A ensured consistent residential fitout quality through in-house manufacturing, coordinated installation, and close project collaboration.

RB&A by Design

RB&A by Design has played a key role in delivering the refined internal finishes at LOUISE, contributing to the high-quality residential outcome through its specialist glazing and fitout expertise.

Working across the 17-storey development, RB&A was engaged to deliver a comprehensive internal package which required a consistent, high-calibre finish across approximately 89 apartments, each designed to reflect a carefully curated architectural vision.

“Our scope included the supply, manufacture and installation of wardrobe sliding doors, shower screens, mirrors and glass kitchen splashbacks,” said Director Bart Bara. “It was about ensuring every element aligned with the overall design intent while maintaining quality across the entire project.”

Achieving this alignment required a structured and collaborative approach from the outset. RB&A worked closely with the project team through a detailed shop drawing process, ensuring all designs were reviewed and approved prior to manufacture. This was further supported by physical sample sign-offs, providing certainty that finishes and materials met both client and architect expectations.

“Materials were selected as per specification, and the design was run through a shop drawing process, approved by both the client and architect,” Bart explained. “Physical samples were also signed off, which helped ensure the final product met the intended standard.”

Consistency across a high-volume residential project is a key challenge, particularly where multiple apartments must achieve uniform finishes within tight construction timeframes. RB&A addressed this through its vertically integrated model, leveraging in-house manufacturing capabilities to maintain strict quality control throughout production.

“RB&A has the capacity to purchase materials in bulk, which reduces variation between batches,” Bart said. “The majority of our finished products are manufactured in our Clayton facility, where we have strict guidelines around quality control before installation.”

This in-house capability not only ensured product consistency but also supported efficient project delivery. With dedicated full-time installation teams, RB&A was able to allocate experienced personnel to site, ensuring works progressed smoothly and in line with programme requirements.

“On site, we have full-time installation teams, and we assign the right personnel to meet the specific requirements of the project,” Bart added. “That allows us to maintain efficiency and deliver on time from start through to handover.”

8 Louise Street interior penthouse bar mirrored splashback.

Sequencing and coordination were critical to the success of the fitout phase, particularly given the number of trades involved. RB&A worked closely with the builder and other subcontractors to align its installation programme with key trades, including kitchen installers, plasterers, tilers and painters.

“We sequenced our works around other trades as per the construction programme,” Bart said. “Having in-house manufacturing reduces lead times, which gives us the flexibility to fit in with the overall sequencing and minimise delays.”

Material performance and durability were also key considerations, particularly in a residential environment where long-term use and ease of maintenance are essential. “All systems we supply and install exceed industry and Australian standards,” Bart noted. “That ensures durability, performance and long-term value for the end user.”

The result is a cohesive and high-quality internal finish that complements the broader architectural vision of LOUISE. Despite the complexity of delivering multiple scopes within a tight programme, RB&A successfully integrated its works with the wider construction team, contributing to a seamless project outcome.

“The project was notable for us because we were able to deliver a high calibre finish within a tight timeframe, working around multiple trades,” Bart said. “We’re very pleased with how our team integrated on site to deliver a successful outcome for everyone involved.”

For more information contact RB&A by Design, 1503 Centre Road, Clayton 3168 VIC 3175, phone 0433 185 500, website www.rbadesign.com.au