ABE Consulting

ABE Consulting, a specialist consulting firm dedicated to creating accessible built environments, provided expert accessibility consulting services. Known for their outcome-based professional advice, ABE Consulting works with project managers, architects, and building certifiers to ensure compliance and accessibility for all end users.

“Our brief required a detailed review of the architectural plans to ensure compliance with key standards, including AS4299 for adaptable apartments, accessible hotel units, and the Disability Discrimination Act (DDA) requirements,” explained Managing Director Abe Strbik. “We were involved from the detailed design phase right through to the Certificate of Occupancy to ensure compliance.”

One of the unique challenges faced on this project was addressing the street gradient interfacing pedestrian entries at the allotment boundary, which required careful alignment with building entries, pathways, and shopfronts.

“We addressed some of these site constraints via a Performance Solution report, which allowed us to navigate accessibility challenges and maintain compliance,” Abe said. Additionally, design changes during construction had flow-on effects that required real-time adjustments to the accessibility design.

Since its establishment in 2013, ABE Consulting has been the preferred access consultant for thousands of projects across residential, commercial, education, healthcare, and retail sectors in New South Wales and the Australian Capital Territory. Their expertise spans all stages of design and construction, including site audits to identify and overcome access barriers.

With an impressive portfolio that includes Sydney’s Royal Prince Alfred Hospital, Meriton’s 180 George Street in Parramatta, and the Sydney Swans HQ, ABE Consulting continues to set the standard for accessible design.

Their involvement in WOVA demonstrates their commitment to ensuring inclusive environments that cater to the needs of all users, reinforcing their role as leaders in accessibility consulting.

For more information contact ABE Consulting, Level 1, 280 Norton Street, Leichhardt NSW 2040, phone 02 8065 0400, email info@abeconsulting.com.au, website www.abeconsulting.com.au

Capital Veneering

Capital Veneering, renowned for its motto ‘Innovation in Joinery’, has showcased their expertise in producing bespoke joinery solutions for the WOVA development. With nearly 25 years in the industry, Capital Veneering has evolved from a small workshop to a multi-award-winning company with over 70 staff, delivering high-quality craftsmanship to both residential and commercial projects.

“Our team was responsible for manufacturing and installing kitchens, laundries, storage units, and wardrobes across the entire WOVA project,” said Ben Stevens. “This included unit kitchens in residential Towers 1, 2, 3, and 4, as well as bespoke joinery in the penthouse units, such as wardrobes and vanities.”

Capital Veneering’s scope extended to the Hotel Tower 1, where they fitted unit kitchens and luggage storage on Levels 1 and 2, and in the common area of Tower 2, where they installed a communal kitchen on Level 4. Despite the scale of the project, their commitment to quality and precision remained uncompromised.

However, the WOVA development did present unique challenges. “Due to unforeseen site delays, one of our biggest challenges was managing storage capacity,” Ben said. “We had to secure over 3,100m² of off-site storage space to accommodate more than 400 units of joinery until site access was available. Our ability to adapt and manage these logistical challenges was key to our success on this project.”

Beyond WOVA, Capital Veneering is engaged in other significant projects, such as the Woden Green Apartments and Melrose Apartments in the Australian Capital Territory.

Capital Veneering’s dedication to excellence is reflected in every aspect of their work, from the use of state-of-the-art machinery to the expertise of their craftsmen. Their passion for unique designs, quality output, and outstanding customer service has solidified their reputation as leaders in the joinery industry.

\For more information contact Capital Veneering, 67-71 Bayldon Road, Queanbeyan NSW 2620, phone 02 6299 1557, email info@capitalveneering.com.au, website www.capitalveneering.com.au

AllPrep Flooring Specialists

AllPrep Flooring Specialists, renowned for its expertise in floor preparation, levelling, and concrete repair, applied innovative techniques to create perfectly flat floors within the 10 buildings of NINE by Mirvac project.

With over 30 years of experience, AllPrep has extensive expertise in preparing subfloors and can refurbish, and level both old and new concrete surfaces. For NINE by Mirvac, AllPrep Flooring utilised the Laticrete Supercap Pump Truck System, a methodology with over 15 years of global application success.

As the only fleet of its kind in Australia, the ALLPREP LATICRETE® SUPERCAP® system has earned a world-class reputation for its versatility and speed. It is also praised as a major advancement in occupational health and safety for floor-levelling workers and other trades nearby.

With all product mixing and pumping done in the Mobile Blending Unit (MBU), the ALLPREP LATICRETE® SUPERCAP® system eliminates the need for manual handling and unloading of heavy product bags—often hundreds of 20kg bags per job. It also prevents exposure to dangerous silica dust, a common hazard with traditional manual mixing inside buildings.

The ALLPREP LATICRETE® SUPERCAP® system lays a
self-levelling compound 50% faster than other products in the market and sets in only four hours, allowing further construction developments to take place in record time.

Tasked with completing comprehensive floor preparation works across all 10 buildings of the NINE by Mirvac site, AllPrep undertook concrete rectification using the advanced SUPERCAP® SC500
self-levelling underlayment to 445 Apartments.

AllPrep’s innovative approach to pouring the self-levelling cement involves pumping it from the self-contained truck at street level directly into the building. This not only enhances efficiency and ensures a quality finish but significantly reduces the environmental footprint by minimising silica dust exposure within the building.

When it comes to floor prep, levelling, and all things concrete repair, coatings, and polished concrete, AllPrep Flooring places quality first. For large projects, they start by inspecting the floor, then a team of skilled surveyors determine the rectifications required – an essential step for concrete rectification works.

AllPrep prides itself on delivering high-quality results on the first try.

“We have the expertise to provide the best solutions for almost any application. Getting it right the first time is crucial,” said David Kealy, AllPrep Flooring Managing Director. “We’re always raising the bar for our customers and clients. We’ve worked with Australia’s top construction companies and, as our results show, we’ve met and exceeded their expectations,” David adds.

The AllPrep site team of 10 commenced work on the NINE by Mirvac site in November 2023 and completed their last pour in July 2024. Currently, the AllPrep team are utilising this system on the prestigious One Sydney Harbour Project, pumping self-levelling materials up to 70 floors in a single application from street level.

Through innovative techniques, a steadfast commitment to quality, and an unwavering focus on environmental and health standards, AllPrep continues to exceed industry expectations. Their reputation for delivering first-time excellence is well-earned, with a wealth of industry knowledge informing every aspect of their operations. From the initial floor inspection by experienced surveyors to the final installation of self-smoothing products, AllPrep’s meticulous approach guarantees optimal results, meeting even the tightest project requirements.

Recently completed and milestone projects include LendLease –One Sydney Harbour, Mirvac – Nine, Richard Crookes – Sirius, Toga – Wicks Place.

For more information contact AllPrep Flooring Specialists, PO Box 184, Round Corner NSW 2158, mobile (David) 0419 289 152, email david@allprepflooring.com.au, website www.allprepflooring.com.au

IC Formwork

Established in 1980, IC Formwork is a leading commercial formwork company with over 40 years of experience, providing innovative solutions across Canberra and Newcastle. Renowned for their proactive approach, commitment to safety, and high-quality outcomes, IC Formwork has played a crucial role in the development of WOVA.

IC Formwork Services were responsible for the design and delivery of all formwork systems at the WOVA inclusive of the jump form, perimeter screens, formwork hoists, prefabricated stairs, slab, column, wall and landscape formwork.

A company that prides itself on providing win-win solutions for builders, IC Formwork Services brought to WOVA its trademark commitment to ensuring clients receive the best possible formwork systems.

In the early stages of the project IC Formwork Services worked closely with GEOCON to ensure the formwork systems would be safe and efficient during the construction phase of the project. The results speak for themselves with the WOVA structure being delivered safely, within programme and to the highest quality standard.


IC Formwork Services’ extensive range of formwork systems for soffit, lift shaft, column, wall and stair formation systems include table and panel systems, hydraulic lift shaft systems, pre-fabricated wall and column systems, pre-fabricated metal decking systems and pre-fabricated stair systems.

For more information contact IC Formwork, 1 Couranga Crescent, Hume ACT 2620, phone 02 6260 1260, email
icf@icformwork.com.au, website www.icformwork.com.au

SYNC

SYNC, an industry leader in prefabricated construction, has once again raised the bar with its latest project: the fabrication of 769 bathroom pods for Mirvac’s luxury residential development, NINE by Mirvac. This landmark project highlights SYNC’s commitment to innovation, quality, and sustainability, revolutionising how bathrooms are integrated into high-rise structures.

At the heart of SYNC’s approach is its state-of-the-art manufacturing facility in Laverton, Victoria, where each bathroom pod was meticulously crafted. The pods feature bespoke designs with premium fixtures, natural stone-clad walls, and advanced feature lighting. Integrating 28 unique pod types highlights SYNC’s customised,
high-quality prefabrication capacity.

“Our focus on prefabrication allows us to deliver high-quality, bespoke bathroom solutions while significantly reducing waste and improving efficiency,” said Chris Ong, Managing Director of SYNC.

By employing Design for Manufacture and Assembly (DfMA) principles, SYNC significantly reduced waste and improved recycling rates. A remarkable 99% of materials were recycled within the factory, showcasing a true commitment to environmental stewardship.

“Innovative construction methods and a commitment to sustainability are at the core of what we do at SYNC. This project exemplifies how we can deliver exceptional results while maintaining our environmental and social responsibilities,” added Chris.

SYNC’s off-site fabrication of the bathroom pods not only streamlined the construction process but also significantly enhanced site safety and efficiency. SYNC effectively mitigated significant risks associated with traditional construction methods by reducing the number of trades required on-site and utilising specialised machinery for material handling.

“By building prototypes and manufacturing off-site, we can control quality and safety to a higher degree, ensuring that each pod meets our stringent standards before reaching the site,” Chris emphasised.

This project is yet another testament to SYNC’s mastery of integrated modular solutions, reinforcing its reputation as a premier contractor in the prefabricated construction industry.

For more information contact SYNC, phone 03 8329 4111, email info@sync.industries, website sync.industries.