Philip Chun

As part of the transformative Boyd Village development by PDG, Philip Chun’s role was to ensure the project adhered to regulatory requirements from concept to completion.

Appointed to deliver building surveying services in accordance with the Building Act 1993 and Building Regulations 2018, Philip Chun’s involvement spanned compliance assessments, building permit approvals, mandatory inspections, and final occupancy certification.

“Our engagement began in late 2019 with a compliance review of pre-tender design documentation,” said Andrew Urli, Director at Philip Chun. “From there, we provided detailed assessments across all design disciplines—structural, civil, architectural, and services—to ensure the design aligned with the Building Code of Australia 2019, which was applicable at the time.”

The site surrounding the heritage building for the former JH Boyd Girls’ School, presented a unique challenge for flood level compliance. “The minimum finished floor level needed to be significantly higher than surrounding streets and footpaths,” Andrew explained. “We worked closely with the design team to ensure Melbourne Water and Melbourne City Council authority requirements where satisfied.”

Philip Chun’s strategic involvement from the early design phase helped drive documentation quality and supported a streamlined approvals process. “Our early compliance reviews set a benchmark for the entire design team and consultants,” Andrew noted. “Once the builder came on board, we provided ongoing compliance reviews tailored to building permit staging, which enabled efficient delivery.”

Throughout the construction process, our statutory role requires mandatory inspections to be undertaken. Chris Farrell, who has over 30 years of experience as a building inspector conducted these inspections from foundations, to concrete pours, to fire rating of apartments on every storey through to completion. The attention to detail during the design and construction process emphasis’s the team aspect at Philip Chun, in being able to deliver a positive outcome for the project and the occupants of Boyd Tower.

From a building surveying perspective, Andrew highlighted the complex ground floor interface and the Level 6 terrace pool zone as particularly challenging and rewarding aspects of the project. “Navigating accessible provisions with elevated entries and rights of access around the adjoining parklands was intricate, but seeing it come together was incredibly satisfying.”

Through proactive engagement and expertise, Philip Chun helped deliver a compliant, accessible, and functional urban development in the heart of Southbank.

For more information contact Philip Chun, Suite 3, Level 1, 5 Queens Road, Melbourne VIC 3004, phone 03 9662 2200, website www.philipchun.com

LTE Construction Group

LTE Construction Group brought its expertise in groundworks and foundations to the ambitious Boyd Village development in Southbank, a transformative social and affordable housing project delivered by PDG. As specialists in civil construction and ground preparation, LTE was responsible for the site cut, installation of foundation piles, rafts, pile caps and slab-on-ground works across the precinct.

“This was a fairly standard job for us in terms of scope,” explained Benjamin Patrick, General Manager at LTE Construction Group. “But every site presents its own set of challenges. Boyd Village was no different.”

One of the primary logistical hurdles was the site’s tight access and the complex urban setting. “We managed the title boundary works and liaised with Hamilton Marino, who handled the broader management plan, including council approvals and traffic plans,” said Patrick. “It was a brownfield site, so there were environmental considerations too.”

A major obstacle emerged early in the foundation works. “We had to use polymer slurry to create deep foundation piles that socket into bedrock,” Patrick explained. “Initially, we lost time due to contaminants—specifically E. coli in the groundwater—were deactivating the polymer slurry. That caused some of the pile shafts to collapse.”

To address the issue, LTE brought in a specialist company to customise and manage the polymer mix on-site. “Once we got the chemistry right, we could produce consistently clean, stable pile holes,” he added. “It was a challenge, but overcoming it became a real point of pride for our team.”

Weekly site meetings and close coordination with builder Hamilton Marino allowed LTE to maintain momentum and compress the schedule where needed. “We often had multiple activities overlapping to make up for lost time,” said Patrick.

In the end, LTE’s ability to deliver the critical groundworks under pressure reflects their reputation for reliability and excellence in infrastructure projects across Melbourne.

For more information contact LTE Construction Group, email info@lteconstructiongroup.com.au, phone 03 9748 3646, website www.lteconstructiongroup.com.au

Philton Group provided full tiling services for Floret Glen Waverley, covering bathrooms, kitchens, and laundries.

Philton Group

Philton Group brought their reputation for quality and consistency to the Floret Glen Waverley development, where they were engaged to deliver full tiling services across the multi-residential project.

Their scope covered bathrooms, ensuites, kitchens, and laundries—key wet areas that demand both durability and aesthetic cohesion.

“Given the size of the project, we staged the works and had a dedicated team on-site to maintain workflow and meet key deadlines,” said Tony Fakhoury, Managing Director of Philton Group.

While all tiles and finishes were selected by the client and design team, the Philton crew was responsible for executing those selections to the highest standard. “We worked strictly to the construction drawings and tile schedules to deliver everything to spec and on time,” Tony explained.

“Our focus was on clean, accurate installations with consistent quality throughout,” Tony said. That quality-first mindset helped ensure the finishes complemented the premium look and feel of the broader Floret Glen Waverley design vision.


Philton Group has expanded its business footprint with the recent acquisition of TILEPRO Australia and Melbourne Home Centre, adding the capacity for a tile and bathware showroom in Epping, as well as a warehouse to support wholesale supply to other tilers and builders. “This helps us offer better service, faster lead times, and a full end-to-end solution for our clients,” Tony said.

The move positions Philton Group to further enhance its service offerings while supporting the broader industry with premium products and logistical efficiency.

As both a trusted tiling contractor and a growing supplier, Philton Group is well placed to continue delivering precision and reliability across Victoria’s residential and commercial construction landscape.

For more information contact Philton Group, 35 Longford Road, Epping VIC 3076, for Trade shop TILEPRO Australia and Melbourne Home Centre, phone 0406 062 103

Farrar delivered robust civil and structural engineering, ensuring Floret’s premium townhomes met durability and drainage standards.

Farrar

Farrar was tasked with crucial engineering responsibilities on the Floret townhouse development, a vibrant collection of 77 architecturally crafted homes in Glen Waverley, developed by Golden Age Group and delivered by Figurehead Construction.

“Farrar played a central role in designing the concrete slabs, retaining walls, and in-ground drainage systems essential to the project’s long-term performance and resilience,” said David Farrar, Director, underscoring Farrar’s hands-on approach to civil and structural engineering excellence.

Floret is set on a 16,500m² site and features a mix of 3-4-bedroom residences over two and three storeys, each meticulously designed by Rothelowman with lush landscaping by Aspect Studios. Delivering these premium townhomes required robust foundational and drainage solutions to manage both structural loads and water flow in a suburban context.

Constructed on ground-floor waffle slabs with prefabricated framing, each residence was delivered with consistent programming and sequencing. Farrar ensured every concrete platform and retaining structure met the project’s strict standards for quality and durability, while integrated drainage systems safeguarded against water issues, an essential consideration in a dense, high-end residential environment

Farrar’s involvement helped secure the engineering integrity that supports Floret’s seamless integration of built form and living landscapes. Their contribution continues to be a quiet, but vital element beneath the elegance of this growing Glen Waverley community.

For more information contact Farrar, 3 Kirks Lane, Melbourne, VIC 3000, phone 03 9600 0424, email info@farrareng.com.au, website www.farrareng.com.au

Gant & Sons provided expert steel fabrication and installation for SASI, ensuring structural precision and durability.

Gant & Sons

Gant & Sons Structural Steelwork—a family-owned leader in steel fabrication and erection across Australia—brings generations of expertise to every project, with a reputation for unmatched precision and quality.

Known for handling intricate, high-detail structural work, Gant & Sons was chosen for the prestigious redevelopment of the South Australian Sports Institute (SASI). This project showcases their commitment to delivering durable, custom-engineered steel solutions that meet the unique needs of complex structures.

“As a company, we have built a reputation of honesty and integrity allowing us to maintain relationships and grow in conjunction with customers and clients,” said Drew Koch. “With the ability to Draft, Fabrication, Transport, Paint and Erect using internal resources, we are in full control of our supply chain and are a ‛one-stop-shop’ for steel solutions.”

Specialising in crane hire, rigging, on-site welding, and steel fabrication, Gant & Sons expertly managed the complexities of the SASI project. “Our approach combines extensive industry knowledge with a commitment to quality and safety, ensuring each phase of the project is executed with precision,” explained Drew.

The scope of work included intricate steel frame installation, demanding not only technical skill but also rigorous adherence to safety standards. “We pride ourselves on a strict, no-tolerance approach to safety. Our team knows that every precaution taken today ensures we all go home safely tomorrow,” said Drew.

With a fleet of cranes up to 55 tonnes, the company handled multiple complex lifts, ensuring seamless integration into the existing infrastructure.

“Our team thrives on challenging projects where we can showcase our comprehensive, one-stop-shop services, from design to final installation,” added Drew.

For more information contact Gant & Sons, 7 Palina Court, Smithfield SA 5114, phone 08 8284 5460, email tenders@gantandsons.com.au, website www.gantandsons.com.au